Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Announcements

Infrastructure Details

External Infrastructure

Road connectivity to APSEZ is made available by a 4-Lane Road connectivity to a length of 7.5 Kms from State Highway which is being extended to NH-5. AP PCPIR Expressway from Gangavaram Port to Atchutapuram junction is being planned.

Water Supply to APSEZ is made readily available by 75 MLD of water from Godavari / Yeluru source.

Power to APSEZ is made available from 220/132 & 33 KV Sub-stations.

 

Internal Infrastructure

  • Developed Plots
  • 4-Lane internal road network
  • Water supply distribution network
  • Power supply distribution network
  • Street Lights
  • Plantations
  • CC storm water drains etc.
  • Common facility center.

Other Proposed Provisions

Some of the components for Private sector Participation.

  • Logistics Hub, Railway Corridor, CETP & Marine Outfall – Existing in Brandix
  • CETP & Marine Outfall – Seperately proposed (within 8-10 months)
  • Fire services, Residential & Rehabilitation facilities, Cafetaria & Restaurant, Skill Development Centres, others.

How to Setup